Straight answers
Colorado Springs remodeling FAQs
The questions every homeowner asks — answered the way we'd want them answered. Anything else, call us at (719) 213-9838.
Timelines & scheduling
How long will my remodel take?
The timeline depends on project scope, material delivery times, and design complexity. Basic bathrooms average 7–10 days. Basements average 5–7 weeks. A kitchen — including custom cabinet design and delivery — runs 6–8 weeks total, with 2–3 weeks of construction after cabinets are delivered and demo begins.
Do we need to move out during the project?
Generally, no — unless it's a major whole-house renovation or the kitchen or bathroom being remodeled is the only one available. We plan the project to be the least impactful to your everyday life.
What hours does the crew work?
We work Monday–Friday, 9:00am to 5:00pm. Depending on the project we can start earlier, but we like to be respectful of the neighbors and mitigate noise early in the morning. We value family time — yours and ours — so we don't make a habit of working past 5:00pm.
Budget & pricing
What does a remodel cost?
Cost varies with scope, size, design, and materials. As a baseline: a full bathroom remodel starts around $16,000–$18,000, and a full kitchen remodel starts around $35,000–$40,000. We pride ourselves on fitting any realistic budget — contact us for a free consultation.
What's included in your estimates?
Standard estimates include materials, labor, debris removal, basic construction cleanup, permits and applicable inspections, and a one-year warranty on craftsmanship.
How does the payment schedule work?
Once the contract is signed: 30% deposit to start, 50% at the halfway point (outlined in the contract), and the final 20% once all inspections are passed and touch-ups are complete.
Logistics & licensing
Are you licensed and insured?
Yes. We can provide our license number upon request, and we carry General Liability insurance.
Who handles permits and inspections?
We do. Handling permits ourselves keeps fidelity of the project and lets us manage documentation and coordination with local building inspectors and tradesmen — which means less stress for you.
Do I pay for materials separately?
No — unless otherwise specified, materials are included in your contract. You select your tiles, flooring, faucets, and finishes; the contract allocates a budget for these items, and if you choose something that costs more, you only pay the difference. We handle sourcing and procurement.
During & after the project
How long before we can use the new shower?
Just overnight if we install new shower glass — the silicone needs to dry. For grout sealer, follow the manufacturer's guidelines; normally 24–48 hours after grout has dried.
Do you clean up each day?
Yes. We leave the site in broom-swept condition with materials stored and stacked each day, and do a full wipe-down cleaning at the conclusion of the project.
Do you provide free estimates?
Yes! Every project is unique, but we do our best to provide accurate free estimates for every client.
Free estimates · Military & first responder discounts
Still have questions?
A 15-minute phone call usually answers most of them — and the estimate is free either way.
